A new white paper, Material Decisions with Measurable Impact: Advancing Sustainability in Data Centers with Coatings Innovation, examines how coatings technologies can help data center owners, specifiers and contractors address sustainability challenges while supporting long-term facility performance.
As AI adoption accelerates and data center demand continues to grow, owners, operators, designers and contractors face increasing pressure to deliver facilities that are resilient, efficient and sustainable. While much attention is placed on power and cooling systems, material specifications can have a significant impact on a data center's environmental footprint, operational reliability and long-term performance.
Download the white paper here.